Riviera Palms 2

Riviera Palms 2Riviera Palms 2Riviera Palms 2

Riviera Palms 2

Riviera Palms 2Riviera Palms 2Riviera Palms 2
  • Home
  • About Us
  • Sales And Rentals
  • Gallery
  • Contact us
  • Res. Assn. Members only
  • Maintenance
  • Latest Maintenance photos
  • Documents
  • Latest additions
  • Archive
  • More
    • Home
    • About Us
    • Sales And Rentals
    • Gallery
    • Contact us
    • Res. Assn. Members only
    • Maintenance
    • Latest Maintenance photos
    • Documents
    • Latest additions
    • Archive
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Sales And Rentals
  • Gallery
  • Contact us
  • Res. Assn. Members only
  • Maintenance
  • Latest Maintenance photos
  • Documents
  • Latest additions
  • Archive

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Latest Maintainance Photos

Completed Works

Below are some of projects which have been completed since the Association came into being

1. Wells

 

In April 2020, the water level in the well by the pool dropped to a lower level than was usual at that time of year. It may be that the new hotel build outside the Palms 2 complex caused the level of the water table in the area to drop but whatever the reason, urgent attention was needed.

The second well, by Block N, had been out of action for several years.

The Committee sought advice about the state of the two wells and concluded that the second well should be brought back into service and both needed to be cleaned and 

de-silted. Obviously the work needed to be done whilst the water table was low and before any heavy rains.

Hence the work was commissioned and cleaning / de-silting of both wells was completed on 22 May 2020

Work to renew the pump of Well 2 is on hold pending increased occupancy of the complex.

Jan 22

2. Lighting

Many of the lamp posts on the complex were broken and some were missing altogether. The electrical wiring covers on some were missing and the wiring itself was in a dangerous condition.

Repairs have now been completed.

Jan 2021

3. Fire extinguishers

Fire extinguishers located around the complex have had their annual  check  in  November  2024.  

4. New Sewage tank behind L block

Digging out the pit. The walls were then rebuilt and new cover slabs cast and laid

5. Drainage improvements

All the manholes on the property have had their side walls lifted so the the covers are visible and are not lost under the dirt. Repairs have been made where required.

October 2021 

There are a lot of manhole covers to access the site drains at various points

6. Roof repairs

Update January 2021

Three contractors were invited to quote to repair the roofs which have been subject to damp problems. But as with the repaint quotes, the prices quoted were very high.  Typically well over 20 lakh to strip and redo the waterproofing of the  three apartment block roofs. 

The MC decided those quotes were too expensive, particularly because just replacing the damp proofing was not guaranteed to resolve all of the water ingress problems

Instead an alternative approach has been adopted for the three apartment blocks. This will mean:

1. Replacing broken tiles

2. Clearing roofs of the apartment blocks of debris and removing overhanging branches

3. Cleaning the roof areas

4. Repainting damaged areas with waterproof paint

Villa roof problems are being resolved as problems are identified.

As of January 2022, work is continuing. It is clear that roof maintenance needs to be ongoing - there are always new problems arising. So please let the MC know of any water ingress problems that members experience.

(Email to palms2residentsassociation@hotmail.com )


Roof repair work

New roof tiles lifted onto roof

    More roof repairs

    New ridge tiles fitted

      Painting of the flat areas with damp proof paint

      Pipe Replacement October 2024

      Garden watering pipework replacement. October 2024

      REPAIR TO HOT WATER SYSTEM L AND M BLOCKS APRIL 2025

        Upcoming Works

         



        Painting of the complex

         

        The following draft proposal, regarding the painting of apartments and villas at Riviera Palms 2, was agreed by the Management Committee at its meeting on 18/08/2020. 

        It is now published on the website so that owners may read and comment as necessary to enable the MC to take note of feedback and fine tune the proposal if necessary / appropriate, before any contracts are placed. 

        1. Not much painting has been done at Palms 2 since the build of the complex almost 15 years ago. The MC believes the paintwork of walls should be refreshed and owners have  supported a proposal at the 2023 AGM. 
        2. It is intended that the whole site will be painted, in a staged programme, during 2023 & 2024.
        3. The MC is currently working hard to identify and commission appropriate contractors  to start work in October 2023.
        4. Before painting work starts any essential roof work should be carried out. To do this it is requested owners provide feedback to the Maintenance Officer reporting any water ingress to their properties - especially if this has been a regular occurrence. (See note on Roof Repairs above).  
        5. Initially any large areas of black mould should be removed by jet washing prior to painting. 
        6. New work schedules have been drawn up for staff to enable as much work as possible to be done in-house. Following this approach it is anticipated that much of the preparatory work (like jet washing). .  
        7. The main fronts and sides of the apartment blocks, and particularly where scaffolding is needed, will be carried out by a suitable / reliable contractor. However it is not currently planned that the internal balcony areas would be painted. (Although we would particularly welcome owners’ views on this point. On one hand owners may not welcome contractors painting their balconies when they are absent and access may be a problem. Conversely however there are certain balcony areas that may look odd if not painted at the same time as the surrounding wall areas) 
        8. The three apartment blocks will be painted sequentially - programme to be determined. There will be consultations with villa owners to agree a work specification and schedule that is mutually acceptable to the owner and the MC. 
        9. The contract(s) will specify the use of high quality paint of a mould resistant variety with a good guarantee. Estimates will be taken from independent contractors and will be structured in such a way as to calculate the cost of painting the three blocks separate from the villas. The contract(s) will be awarded on the basis of best value for money and at the discretion of the Management Committee after discussion with GEMS. Payments will be staggered and the final payment withheld until the quality of the finished job is approved by Gems plus at least one member of the Committee.

          Proposed by Nick Arnold, Maintenance Officer of Riviera Palms 2 on behalf of the Management Committee.

          Feedback please to palms2maintenance@hotmail.com 

        Updated July 2023


        Painting Update

         As of Autumn 2021 large scale painting was suspended temporarily. The MC felt it was not a sensible use of money whilst Covid is prevalent resulting in very low occupancy levels. It is anticipated the programme will be ramped up again post the 2022 monsoon.

        As of July 2023, the MC is working hard to  identify contractors capable of doing a quality job at a fair price. Meanwhile our staff are touching up accessible areas



        UPDATE: The Riviera Palms 2 Complex has undergone a complete repainting project. This work was completed during the 2024/2025 financial year and has transformed the complex which now looks like new.